1. A visual depiction of the subassemblies and components that are needed to produce and/or assemble a product is called...

Get help with any kind of assignment - from a high school essay to a PhD dissertation


1. A visual depiction of the subassemblies and components that are needed to produce and/or assemble a product is called a(n):
A) assembly time chart
B) product structure tree
C) MRP II
D) pegging
E) Gantt chart2. Which one of the following most closely describes net material requirements?
A) gross requirements - amount on-hand - scheduled receipts
B) gross requirements - planned receipts
C) gross requirements - order releases + amount on-hand
D) gross requirements - planned order releases
E) gross requirements - amount on-hand + planned order releases
3. In MRP, "scheduled receipts" are:
A) identical to "planned-order receipts"
B) identical to "planned-order releases"
C) open orders (that is, ordered before the first time bucket, but not delivered yet)
D) "net requirements"
E) available to promise inventory4. In MRP, the gross requirements of a given component part are calculated from:
A) net requirements + amount on-hand.
B) gross requirements of the immediate parent
C) planned orders of the end item
D) net requirements of end item
E) planned orders of the immediate parent
5. Which of the following lot sizing methods does not attempt to balance ordering (or setup) and holding costs?
A) economic order quantity
B) economic run size
C) lot-for-lot
D) part-period
E) all of the above6. The multiplication process used by MRP to determine lower level requirements is called:
A) time-phasing
B) pegging
C) netting
D) projecting
E) exploding
7. Which statement concerning MRP II is false?
A) It is basically a computerized system.
B) It can handle complex planning and scheduling quickly.
C) It involves other functional areas in the production planning process.
D) It involves capacity planning.
E) It produces a production plan which includes all resources required.
8. A recent effort to expand the scope of production resource planning by involving other functional areas in the planning process has been:
A) material requirements planning
B) capacity requirements planning
C) manufacturing resources planning
D) Just-In-Time planning
E) multifunctional relationships planning
9. A report which shows expected capacity requirements for current, planned, and expected jobs is a:
A) master production schedule
B) bill of materials report
C) inventory status report
D) MRP schedule
E) load report
10. Which is true of a net-change system?
A) It is a batch-type system which is updated periodically.
B) It is usually run at the beginning of each month.
C) The basic production plan is modified to reflect changes as they occur.
D) It is used to authorize the execution of planned orders.
E) It indicates the amount and timing of future changes.
11. Which of the following is the last step in the capacity/scheduling chain?
A) product planning
B) process planning
C) capacity planning
D) aggregate planning
E) scheduling12. Primary considerations in scheduling high volume systems involve:

I. coordinating the flow of inputs
II. overcoming the disruptions to planned outputs
III. assigning workers to work centers A) I and III
B) I and II
C) II and III
D) I, II, and III
E) II only
13. Finite loading, as compared to infinite loading, assumes that:
A) There are a finite number of jobs to be done.
B) Work centers can be loaded without regard to their capacity.
C) Work centers' capacity must be taken into account.
D) Work centers' capacity may be taken into account, but it's not required.
E) Loading must be completed in a finite amount of time.14. Based on the cost information given in the table below, which set of job-machine pairs reflects the minimum-cost solution using the Assignment method?

Machine
A B C
Job 1 $0 0 0
2 3 6 4
3 2 4 0 A) 1-B, 2-A, 3-C
B) 1-A, 2-B, 3-C
C) 1-C, 2-A, 3-B
D) 1-B, 2-C, 3-A
E) 1-C, 2-B, 3-A
15. The priority rule where jobs are processed according to the smallest ratio of due date to processing time is:
A) CR
B) EEDD
C) FCFS
D) S/O
E) SPT16. Which of the following is not a measure for judging the effectiveness of a schedule sequence?
A) average number of jobs at the work center
B) total number of jobs at the work center
C) average completion (flow) time
D) average job tardiness
E) none of the above17. Average completion (flow) time for a schedule sequence at a work center is:
A) total processing time divided by the number of jobs
B) total flow time divided by the number of jobs
C) total flow time divided by total processing time
D) total processing time plus total late time divided by number of jobs
E) total flow time plus total late time divided by number of jobs
18. The scheduling sequencing rule which always results in the lowest average completion (flow) time is the:
A) first come, first served (FCFS) rule
B) shortest processing time first (SPT) rule
C) earliest due date first (EDD) rule
D) least slack per operation first (S/O) rule
E) run until slack happens (RUSH) rule
19. For the jobs listed below, which processing sequence would result using Johnson's Rule?

Processing time (hrs.)
Job Center 1 Center 2
a 6 11
b 12 8
c 5 9
d 10 7 A) c-a-d-b
B) b-d-a-c
C) a-b-c-d
D) d-c-b-a
E) c-a-b-d20. Scheduling in service systems often takes the form of:
A) appointment systems
B) reservation systems
C) (A) and (B)
D) makespan systems
E) all of the above










OUR SERVICE CHARTER







  • Better Grades Guarantee

    Our team of writers prides in high-level competence. The writers have the required expertise that enables them to deliver quality papers that match with the requirements of the grading rubric. In the absence of the rubric, we ensure that the writers follow the clients’ instruction brief to the letter. We can confidently assure our clients to expect nothing short of a pass from the papers that we deliver. Importantly, we have qualified writers who handle different areas of study. This diversification enables us to allot clients’ orders to the writer who is well seasoned in the subject area of study. It also enables the team to become more professional due to specialization. Our clients should put their trust in our service delivery and expect to successfully attain high grades at all times. The fact that we offer free revision reflects our dedication in delivering high quality papers that match with our clients’ expectations.
  • 100% Plagiarism-Free Guarantee

    We deliver top-quality essays through employing various measures that seek to improve the content of a given assignment. One of the quality-control systems that we use entails plagiarism checkers. These systems help us to deliver a 100% plagiarism-free papers to our clients. We also value the originality of papers, and we do not resell any submitted paper. It means that every client always gets a unique paper. Additionally, our perfect team of writers is usually keen on the academic writing standards as well as the instructions brief that a client submits. Our team of writers holds matchless competence when it comes to its service delivery. Every member of the team usually has an academic degree, and the team’s diversified skills make it possible for us to have a qualified writer in any client’s area of study. Additionally, our past clients have always given a positive feedback on each of our writers.
  • Money Back Guarantee

    If any of our writers deliver an incomplete or ambiguous paper that is off the topic, our clients can claim for a refund in regard to the oversight. We do not compromise our service delivery through submission of a paper that does not follow our clients’ instructions. We also mind about the interest of our customers, and we always give them value for their money. However, our clients have a choice to request for a free revision within 14-30 days, or depending on the length of the submitted paper. A client who needs a refund should send a request for it within 14 days after receiving the completed paper. If a client decides not to download the paper, then they can request for 100% refund. Any refunded amount usually goes to the client’s Bonus Balance as store credit. There is always extra compensation when the refund takes the form of store credit. Alternatively, the refunded amount can also go the client’s credit card.
  • Excellent Quality Work

    Grammar is one of the elements that we take seriously in our service delivery. Beside the use of spell checkers, we progressively take our writers through the essentials of a quality paper that features information clarity. Importantly, we encourage our writers to avoid coming up with a paper that deviates from the elements that appear on the client’s instruction brief. It means that the papers that we deliver denote well researched information that is rich in details. Additionally, the papers usually contain exhaustive details on any instruction that a client submitted. It is the tireless application of our writers’ efforts that makes us stand out when it comes to the delivery of excellent quality work. Notably, our writers use quality resources when digging up information that a paper requires. They are usually aware of the sources that contain rich information. Our past clients have proved that we give nothing short of quality work through giving us a positive feedback.